Demand charge
A demand charge is the part of a commercial or industrial electricity bill based on the capacity you required rather than the units you consumed. It is priced per kW or kVA and set by your highest recorded interval in the month or by your contracted demand.
Key facts
- •It bills capacity, not consumption: a high-usage site with a flat load can pay less per unit than a low-usage site with sharp peaks.
- •The rate is per kW or kVA per month, and it appears in your state’s tariff order.
- •Demand is measured as an average over an interval, commonly 15 or 30 minutes.
- •One bad interval can set the figure for the whole month.
- •Many tariffs also apply a floor tied to contracted demand, so a lower peak does not always mean a lower bill.
How it works
A commercial bill has two broad parts: what you consumed, and what capacity you required. The energy line follows total units. The demand line follows your worst interval, either as recorded maximum demand or against the contracted demand agreed with your DISCOM.
Your meter averages load over each interval and keeps the highest figure. A few motors starting together for some minutes therefore lift one interval, and that one interval can decide the charge for the month even though the event was brief.
Worked example
These figures are illustrative; your own rate and rules are in your current tariff schedule. A site runs at a steady 500 kW on a 15-minute meter, billed at ₹400 per kW per month. One morning, motors add 300 kW for five minutes.
The interval average becomes 500 + (300 × 5 ÷ 15) = 600 kW. The demand charge is 600 × ₹400 = ₹2,40,000 instead of 500 × ₹400 = ₹2,00,000. Five minutes cost ₹40,000 that month.
Now add a billing floor of 75 per cent on a contracted demand of 800 kW, which is 600 kW. Removing the spike saves nothing, because the bill stays at 600 kW until the contracted demand itself is reduced.
Why it matters to a buyer in India
For sites with a maximum demand component, this is usually the largest and most dependable saving a battery can offer. It repeats monthly and depends less on the spread between tariff periods than time-of-day shifting does, though the rate itself can still be revised.
Common mistakes
Four errors recur when sites assess this line of the bill:
- •Reading monthly bills and assuming they show the peak’s height, length or frequency. They show only that it happened.
- •Ignoring whether billing is in kW or kVA, which brings power factor into the figure.
- •Assuming a lower peak cuts the bill without checking the floor and the process for reducing contracted demand.
- •Forgetting the penalty structure for exceeding contracted demand.
Frequently asked questions
What is the difference between contracted demand and recorded maximum demand?+
Contracted demand is the capacity you have agreed with your DISCOM. Recorded maximum demand is the highest interval your meter actually measured in the billing period. Tariffs differ on how they combine the two, so check your schedule for which figure is billed and what happens if you exceed the contract.
Do homes pay demand charges?+
Most households pay a fixed charge linked to sanctioned load instead of one based on a metered peak, though the arrangement varies by state. The structure described here is typical of commercial and industrial tariffs. Your own bill and your DISCOM’s tariff schedule will show which applies.
Read more
- The Charging Station Money Problem: Why the Maths Only Works Above a Certain Utilisation Finance
- Peak Shaving and Demand Charges: How a BESS Cuts a Commercial Electricity Bill C&I storage
- Time-of-Day Tariffs in India: What They Mean for Battery Storage C&I storage
- Battery Storage for Factories and Offices: Where the Savings Actually Come From C&I storage
- Maharashtra Drafts a Storage Mandate for Rooftop Solar Above 100 kW News
- Round-Trip Efficiency: Where the Energy Goes in a Battery Storage System Explainer
Related terms
Is storage right for your site?
Send us a month of electricity bills and your load profile, and we will tell you what a battery would save — including when it would not pay.