Round-trip efficiency (RTE)
Round-trip efficiency (RTE) is the share of the energy put into a storage system that can be taken back out. Charge a system with 100 kWh, recover 85 kWh, and its round-trip efficiency is 85 per cent.
Key facts
- •RTE = energy out ÷ energy in × 100, measured over a full cycle
- •LFP cells typically return 94–97 per cent, measured in DC at moderate rates
- •A figure at the point of connection, with auxiliary load, is often in the mid-80s
- •Heat, partial-load running and infrequent cycling all push the figure down
- •It drifts lower with age as internal resistance rises
Where the energy goes
Losses arise in the cells, in the power conversion system on each pass, in any transformer on each pass, and in the auxiliary load: cooling, controls and fire systems. Standby use continues between cycles.
Take 1,000 kWh from the grid through an illustrative chain: transformer at 99 per cent (990 kWh), PCS at 98 per cent (970 kWh), cells at 95 per cent (922 kWh), PCS again (903 kWh), transformer again (894 kWh). Subtract 40 kWh of auxiliary load and the meter sees about 854 kWh. That is about 85 per cent from cells honestly described as 95 per cent efficient.
What it does to the savings
If off-peak power costs ₹4 per kWh and peak power ₹9 (illustrative figures), the headline spread is ₹5. At 85 per cent RTE each delivered unit costs ₹4 ÷ 0.85, or about ₹4.71, so the real spread is about ₹4.29. Shifting earns nothing until the peak price exceeds the off-peak price divided by the RTE, before even counting degradation.
Scale matters. Delivering 200 kWh a day for 300 days needs about 235 kWh a day at 85 per cent and 222 kWh a day at 90 per cent. At ₹4 per kWh that five-point gap is worth about ₹15,700 a year. Peak shaving is less sensitive, because its value comes mainly from demand charges avoided.
What to ask for
Ask where the figure is measured, because a cell, inverter-terminal and point-of-connection figure can all be true of the same hardware. A DC figure covers the battery side. An AC figure adds the PCS, and perhaps the transformer. Neither includes auxiliary load unless the document says so.
- •The RTE at the point of connection
- •Whether auxiliary consumption is included, and the expected annual total in kWh
- •The test conditions: rate, ambient temperature and state-of-charge window
- •Whether the figure is guaranteed, how it is tested and the remedy if it falls short
Frequently asked questions
What is a good round-trip efficiency for a commercial battery system?+
Compare only like with like. Modern LFP systems often reach the high 80s to low 90s on an AC basis before auxiliary load, and lower once cooling is netted off in a hot climate. A boundary-free claim of 95 per cent usually describes the cells alone.
Can a buyer verify round-trip efficiency after installation?+
Yes. Metering at the point of connection records energy in both directions, so the ratio can be calculated over a period, allowing for any difference in state of charge between its start and end. That makes it worth writing into the contract.
Read more
- Round-Trip Efficiency: Where the Energy Goes in a Battery Storage System Explainer
- Sizing a Commercial BESS: kW versus kWh, C-Rate and Duty Cycle Explained C&I storage
- From Order to Energisation: How a Battery Storage Plant Actually Gets Built Grid storage
- Beyond Lithium: Long-Duration Energy Storage Options Explained Grid storage
- Inside the Fence: What a Battery Plant Is Made Of Besides Batteries Grid storage
- Sizing a Grid Battery: Power, Energy, Duration and the Augmentation Problem Grid storage
Related terms
Is storage right for your site?
Send us a month of electricity bills and your load profile, and we will tell you what a battery would save — including when it would not pay.